Barrow
Gas Field Chiller
Building
Barrow, Alaska

Inlet provided and installed a process natural gas chiller unit, which was custom engineered and built. This unit is capable of refrigerating 900 psi natural gas flowing at 12M CFD from +50 deg to -42 degrees F to remove hydrocarbon liquids in the commercial gas supply to Barrow Alaska.

Sourcing, design, installation & commissioning were performed as part of this project.






Barrow Gas Fields Shop/Office
Barrow, Alaska

This project consisted of construction of a new 18,000 square foot equipment maintenance and office facility in Barrow.
 
The scope of work included all waste, vent and drain piping, trench drain and oily water separation, sewage lift station, complete hydronic heating system, heat generation and exchange, infrared shop heating, natural gas fuel piping to equipment. Inlet installed a commercial domestic hot water system, and arctic pipe water and sewer services to utilities. Also included was an industrial compressed air distribution system, lubrication equipment and rack system.

Subtrades included air handling equipment & distribution ductwork, complete DDC controls system, mechanical insulation and balancing of hydronic & HVAC systems.






Nome Airport ARFF/SREB

Nome, Alaska



 

 

In Nome, Inlet was involved in the construction of a new 20,000 square foot equipment maintenance and office facility at the Nome airport.

The scope of work included all waste, vent and drain piping, trench drain and oily water separation, a sewage lift station, complete hydronic heating system, heat generation and exchange, radiant floor heating, fuel oil storage tanks, monitoring and piping to equipment. It also included a commercial domestic hot water system, and arctic pipe water and sewer services to the city utilities. Inlet was also responsible for an industrial compressed air distribution system, lubrication equipment and rack system.

Subtrades included air handling equipment & distribution ductwork, complete DDC controls system, mechanical insulation and balancing of hydronic & HVAC systems.



 

Bethel TESS Learning Center

Bethel, Alaska

 Inlet Mechanical provided all plumbing, heating and mechanical for a new three story wood frame vocational facility.

The scope of work included: all waste, vent and drain piping, a complete hydronic heating system, fuel oil storage tanks and piping to equipment. It also included a commercial domestic hot water system, service for a commercial kitchen and arctic pipe water and sewer services to the city system.

Sub-trades included air handling equipment and distribution ductwork, a complete DDC controls system, mechanical insulation and balancing of hydronic and HVAC systems


 



North Slope
Borough Area Wide Waste Heat Repairs

Anaktuvuk Pass, Kaktovik, Atqasuk & Nuiqsut, Alaska


 

This project consisted of repairs to above ground and below ground water and sewer distribution lines; also, new services to both the water treatment and sewer plants.

Work included: excavation in permafrost, installation of new 4”, 6” and 8” insulated water and sewer piping, repair of existing 6” & 8” water and sewer mains utilizing butt and electrofusion HDPE materials and re-insulation.

Repairs required bypass piping and shutdown of the city wide system to accomplish repairs and maintain service.